1. For Switch docking station assembly, which contains all the accessories that need to be used, which can facilitate the transfer of the original base to the grain docking station for normal use. The grain docking station is lighter and more beautiful, and it is also more convenient for the host to dissipate heat. Will wear out the host screen
2. Magnetic dust cover design, automatic adsorption and alignment
3. Large non-slip mat, stable and non-slip
4. Reserve for Switch air inlet to keep for Switch host cool at all times
5. Applicable products: for Switch
6. Note: This is only a DIY accessory for the docking station
Assembly steps:
1. Take out the Y-shaped screwdriver below and remove the 8 screws on the back of the original base (the removed screws can be placed in the screw slot in the lower left corner to avoid loss).
2. Gently take out the circuit board, open the cable holder, pull out the cable, and unplug the small socket on the back
3. Now plug in the new cable, buckle the cable seat, and place the circuit board
4. Close the back cover and fix the 6 screw holes with the matching screws
5. Take out the anti-slip mat, tear off the protective film on the back, and stick it on the back along the groove of the anti-slip mat